Conservation area tree notice: when can the work start?

For trees in a conservation area in England. Find the first and last day your six week notice allows, and whether a thin trunk needs notice at all.

What do you plan to do to the tree?

Diameter in millimetres, over the bark, 1.5 metres above natural ground level. With several stems at that height, enter the widest. A tape round the trunk gives the distance round: divide it by 3.14.

050100150200250

180 mm trunk: over the 75 mm limit for this work. The dashed circle is the 75 mm limit.

Is the tree dead or dangerous?
What is the date of your notice?

The day you gave the notice to the council. If it was posted, or the council logs a later day, use the later day. Leave empty if you have not sent it. For example, 2 11 2026.

What has the council said?

Check the council’s Tree Preservation Order map too: a tree may already be covered.

When do you plan to do the work? (optional)

For work over several days, check the first day and then the last. For example, 18 1 2027.

Your answer

Without earlier consent

Work can start from 15 December 2026

The six weeks from your notice of 2 November 2026 last to the end of 14 December 2026. Plan to finish by 1 November 2028. This holds only if the council has not made a Tree Preservation Order on the tree. If the council gives a later date, ask it why and use the later one.

18 January 2027 is inside the dates

This is a check of the notice dates only. Look at the other rules below before the saw starts.

Example: cutting down a 180 mm tree, notice dated 2 November 2026, no reply, work planned for 18 January 2027.

Your notice dates

Date of your notice
2 November 2026Day 0. It is not counted.
Last day of the six weeks
14 December 202642 days after the notice.
First day without consent
15 December 2026The day after the six weeks end.
Finish by
1 November 2028One day before the second anniversary, 2 November 2028, to stay clear of any argument about the last day.

These dates do not clear everything

  • Intentionally damaging or destroying a wild bird’s nest while it is in use or being built is an offence at any time of year. Look before work starts.
  • Felling a larger volume of timber can need a separate felling licence.
  • Planning conditions, protected species such as bats, and your right to work on the land are separate questions.

In England, work on a tree covered by a conservation area notice can start once six weeks from the date of your section 211 notice have ended, or sooner with the council’s consent. Without consent it must be done within two years of that date, and not if a Tree Preservation Order is made. For example, a notice dated 2 November 2026 allows a start from 15 December 2026.

How the notice period works

Conservation areas protect more than buildings. In England, many trees inside one are covered by section 211 of the Town and Country Planning Act 1990 even though nobody has made an order about them individually. Before you cut down, top, lop or uproot such a tree, you tell the council. This warning is called a section 211 notice. It gives the council a window to look at the tree and decide whether it is worth protecting with a Tree Preservation Order.

A section 211 notice is a notice, not an application. You are not waiting for permission to be granted. You are waiting for one of three things: the council makes an Order, the council says the work can go ahead, or six weeks pass without an Order.

  1. Find the date of your notice, which counts as day 0.
  2. Count 42 days after it. That is the last day of the six weeks.
  3. Without earlier consent from the council, start no sooner than the next day, which is day 43.
  4. Add two years to the date of the notice, and plan to finish before that anniversary.
  5. Before work starts, check that no Tree Preservation Order has been made.

The Act says the work must come after six weeks “from the date of the notice” and before two years “from that date”. This page does not count the notice day itself. Where the exact edge of a period could be argued, it picks the cautious day: it starts on day 43 rather than day 42, and finishes the day before the second anniversary. A council letter may quote a date one day different. Do not use that difference to squeeze work in early.

Worked examples

A notice dated 2 November 2026

The six weeks last to the end of 14 December 2026. With no Order and no earlier consent, work can start from 15 December 2026. The cautious last day is 1 November 2028. A visit planned for 18 January 2027 sits well inside those dates.

The council consents early

Take the same notice, with written consent dated 20 November 2026. Work can go ahead from 20 November 2026, so a visit on 30 November no longer has to wait. The statute attaches its two year limit to the route that relies on the six weeks passing. GOV.UK mentions two years in the same context. Read the consent letter, and treat 1 November 2028 as a sensible finishing day.

An old notice from a previous quote

Suppose a notice was dated 10 March 2025, the job was put off, and a tree surgeon is now booked for 5 April 2027. The cautious last day was 9 March 2027, so that visit is too late. A new notice for that day would need to be dated no earlier than 6 April 2025 and no later than 21 February 2027.

A notice dated 29 February

A notice dated 29 February 2028 has no matching date two years later. The page treats the anniversary as 28 February 2030 and plans to finish by 27 February 2030.

What changes the answer

Making a notice the council can act on

The Act asks for enough detail to identify the tree. In practice, say which tree it is, show its position on a simple sketch, and describe the work you intend to do. Be specific about the work, because the defence in the Act is about the act your notice described. Many councils have a form, and many accept notices online. Keep a copy and proof of the day it arrived. If the council writes back with a date it received or registered the notice, compare it with yours.

Book the tree surgeon with the dates in mind. The earliest start leaves no slack if the council asks questions, and a busy season can push a visit by weeks. At the other end, a job split into stages must have every stage done inside the period.

If you are not sure whether your address is in a conservation area, the council’s planning pages normally have a map, and the same department can tell you about Orders. Ownership matters too: a notice about a neighbour’s tree does not give you any right to go onto their land or cut it.

Replacing trees and getting it wrong

Doing work without a notice where one is required is an offence, and so is causing or permitting it. Section 210 provides an unlimited fine for the most serious acts, those that destroy a tree or are likely to. GOV.UK also describes a duty to plant a replacement tree in some cases, including trees removed in breach of section 211. A homeowner who hires a contractor should not assume the contractor has dealt with the paperwork: ask to see the notice and its date.

Assumptions and sources

Rule usedValueSource
Section 211 noticeNotice of intention, enough to identify the tree; work with consent, or after six weeks and before two years from the date of the noticeTown and Country Planning Act 1990, section 211 (revised version, changes to 25 November 2026; checked 26 November 2026)
Consent, Orders and no refusalEarly consent allowed; the council may make an Order; it cannot refuse or condition a noticeGOV.UK, Tree Preservation Orders and trees in conservation areas (published 6 March 2014; paragraphs revised 6 March 2014; checked 26 November 2026): paragraphs 116 to 118
Trunk size75 mm; 100 mm for cutting down or uprooting solely to improve other trees; measured over bark at 1.5 m; any larger stem countsTown and Country Planning (Tree Preservation) (England) Regulations 2012, regulation 15 (in force 6 April 2012; checked 26 November 2026); GOV.UK paragraph 131
Dead trees and urgent riskAt least five working days’ written notice; urgent work, as soon as practicableTown and Country Planning (Tree Preservation) (England) Regulations 2012, regulation 14 (revised version, last amended 5 November 2025; checked 26 November 2026); GOV.UK paragraph 133 (which says five days)
Other exceptionsListed, not tested by this pageTown and Country Planning (Tree Preservation) (England) Regulations 2012, regulation 14 (revised version, last amended 5 November 2025; checked 26 November 2026); Town and Country Planning (Tree Preservation) (England) Regulations 2012, regulation 15 (in force 6 April 2012; checked 26 November 2026)
Penalties and replacement treesAs described aboveTown and Country Planning Act 1990, section 210 (revised version as published; checked 26 November 2026); GOV.UK, Tree Preservation Orders and trees in conservation areas (published 6 March 2014; paragraphs revised 6 March 2014; checked 26 November 2026): paragraphs 120 and 121
NestsIntentionally damaging or destroying a nest in use or being built is an offenceWildlife and Countryside Act 1981, section 1 (England and Wales version, as revised; checked 26 November 2026)
Felling licencesSeparate rules that can apply to larger volumes of timberGOV.UK, Tree felling licence: when you need to apply (published 8 July 2026; checked 26 November 2026)
Day counting and cautious edgesNotice day not counted; start on day 43; finish the day before the second anniversary; 29 February becomes 28 FebruaryThis page’s method, set 26 November 2026
Date of the noticeThe day you enter; use the later day if in doubtThis page’s method, set 26 November 2026

Common questions

How long is the notice period for tree work in a conservation area?

Six weeks from the date of your section 211 notice. Work can go ahead sooner only if the council consents. Without consent, it must be done after the six weeks have ended and before two years from the date of the notice have passed.

Does silence from the council mean I can go ahead?

If the six weeks end and the council has not made a Tree Preservation Order on the tree, GOV.UK says the work you described may be done within two years of the date of the notice. Check that no Order has been made, and that your notice reached the council and identified the tree.

Does the two years start when the six weeks end?

No. Section 211 counts both periods from the date of the notice. The waiting time is part of the two years, so waiting does not add to it.

Can the council refuse my section 211 notice?

GOV.UK says a section 211 notice is not an application, so the council cannot refuse consent or grant it with conditions. What it can do is make a Tree Preservation Order on the tree, which brings the Order’s own controls.

Do I need to give notice to cut back a small tree?

Not for topping or lopping a tree whose diameter does not exceed 75 millimetres. Cutting down or uprooting is also exempt up to 75 millimetres, or up to 100 millimetres where the sole purpose is to improve the growth of other trees. Diameter is measured over the bark 1.5 metres above natural ground level.

What if a branch is about to fall?

Work urgently necessary to remove an immediate risk of serious harm does not need the six weeks, but only to the extent needed to remove that risk. Written notice is due as soon as practicable after the work becomes necessary.

What is the penalty for cutting a tree down without notice?

Section 211 applies the penalties in section 210. Cutting down, uprooting or wilfully destroying a tree, or damaging, topping or lopping it in a way likely to destroy it, can bring an unlimited fine. Other breaches can bring a fine up to level 4 on the standard scale. A court weighing the larger offence must have regard to any financial benefit.

Does this apply in Wales or Scotland?

This calculator covers England only. Wales shares section 211 but has its own regulations on exceptions, and Scotland has separate law. Ask your council there.

Related calculators

Page last checked 26 November 2026.